Metal Supply and Sales Magazine  

Nlmk. June

NLMK revamps its melt shop


NLMK  
NLMK has started the installation of main equipment for the revamped Continuous Casting Machine No.3 (CCM) at its main production site in Lipetsk. As a result, CCM production capacity will increase by more than 300 000 tpa, up to 1 mln tpa. CCM-3 will produce a wide mix of high-quality slabs of various steel grades. State of the art equipment, 20-25% faster casting speeds and longer interrepair periods will boost CCM efficiency. Product mix will expand with an increase in maximum ...
17.06.2011, Friday, 17:02  


Account
Login:
Password:
Remember me :